Market application
Earthing and bonding terminology for UK projects
UK specifications normally distinguish earthing from protective bonding. Exothermic welding may be considered for permanent connections within designed earthing, lightning-protection, rail, renewable-energy or industrial grounding systems, subject to the project requirements.
Copper tape dimensions, stranded conductor cross-sections and electrode diameters should be stated in millimetres. For outdoor projects, storage and mould preparation must account for rain, condensation and damp working conditions because moisture can affect the process.

Project sectors
Where permanent connections may be specified
Application suitability and acceptance must be confirmed by the project designer and relevant authority.
Rail and transport infrastructure
Continuity, cable, rail and structural bonding connections defined by the system designer.
Renewable energy and storage
Earthing connections for solar, wind, battery and associated electrical infrastructure.
Data centres and utilities
Permanent conductor and electrode connections within specified earthing networks.
Lightning protection and buildings
Tape, cable, electrode and steel connections selected for the approved design.
Complete system
Products selected as one connection package
A cartridge, mould and accessory set should be selected from the same confirmed connection data.
Weld material
Measured cartridges for the specified mould and conductor combination, available in multiple charge sizes.
Explore weld material →Graphite moulds
Reusable tooling made for a defined joint geometry, orientation and conductor dimensions.
Browse moulds →Kits & accessories
Handle clamps, steel discs, ignition equipment, cleaning tools and preparation accessories.
View kit components →Specification context
Confirm the current local and project requirements
The IET publishes BS 7671 requirements for electrical installations and Guidance Note 8 for earthing and bonding, including information from BS 7430. The current project specification and responsible designer determine which standards, materials and verification requirements apply.
Official reference: IET guidance on earthing and bonding ↗A reference to a standard or authority does not claim automatic product approval. Always obtain project-specific engineering and material approval.
Accurate quotation
What to send with your enquiry
A UK enquiry should state cable cross-section, tape width and thickness, earth-electrode diameter, joint orientation, quantity, delivery postcode and required technical submittals. If a tender uses a connection code from another system, include a drawing so the geometry can be checked.
- Connection drawing or joint description
- Conductor materials and exact dimensions
- Quantity for each connection
- Required moulds, clamps and consumables
- Delivery destination and commercial terms
- Required certificates and submittal documents

Experience and accountability
Technical information from the manufacturer
This page is published by Amiable Impex, the manufacturer of Aura Weld® exothermic welding products. Product selection guidance is based on connection geometry and supplied technical information. Installation must be performed by trained personnel using the instructions, safety controls and approvals applicable to the project.
Technical content reviewed by the Amiable Impex product team ·
Frequently asked questions
Questions from United Kingdom buyers
Can Aura Weld products be quoted for delivery to the UK?
Amiable Impex accepts UK export enquiries and confirms availability, shipment terms and applicable documents with the quotation.
What information is required for a copper-tape connection?
Provide tape width, thickness, material, the second conductor or surface, joint orientation and quantity.
Why must the graphite mould be dry?
Graphite can retain moisture. The mould must be inspected and prepared according to the supplied instructions before use.
Does an exothermic weld automatically satisfy BS 7671?
No. The complete installation must be designed, selected, erected and verified against the applicable requirements by competent parties.
Can you match an existing connection drawing?
Yes. Send the drawing and conductor schedule so the Amiable Impex team can identify an appropriate Aura Weld configuration or explain what additional details are needed.